H型钢组立与点固:把板条变成稳定的焊接输入
本項目提供的設備照片

assembly first establishes the geometric relationship, and tack welding is responsible for maintaining it

After the web and flange plate are cut, cleaned and dimensional inspected, they enter the assembly station according to the drawing number. The positioning rollers constrain the relative position of the panels, and the hydraulic pressure maintains the fit. The upper top wheel and the conveyor roller conveyor provide support. The panels pass through the tack welding area to form a transportable T-shaped or H-shaped component.

tack welding is used to maintain the assembly relationship and does not replace the main welding specified in the drawing. When the size, gap or misalignment is abnormal, the incoming materials should be checked and positioned first; the out-of-tolerance slats should not be temporarily locked and handed over to the next work station by increasing tack welding or forcibly pressing them.

The benchmarks for different beam types should be written on the process card

The constant-section beam is usually positioned according to the stable web and flange datum; the tapered-section beam needs to indicate the large and small ends, slope and feeding direction; the asymmetric beam needs to indicate the web offset and the upper and lower flange width and thickness difference. The workpiece datum cannot just write "centering", otherwise different references may be used for operation and inspection.

The split flange plate positioning structure in the assembly data can be positioned off-center within the allowable range, but the offset amount, clamping range and full-length transportation should still be checked picture by picture. The dead weight of the long beam, the bending of the incoming material and the height difference of the roller conveyor may also change the joint state during compression.

First Article Setup and Baseline Check
Check objectRequires explicit conditionsVerification method
web locationCenter or offset datum, endianness and directionMeasure at the agreed cross-section position according to the drawing
Flange positionUpper and lower flange distinction, width and overhangCheck board number, contact surface and assembly dimensions
Connector fitGap, misalignment and vertical relationshipInspect before and after compression, and release according to process
Long beam supportroller conveyor elevation, load-bearing and feeding trackSlowly send the representative workpiece and observe the status

Model filtering should retain respective parameters

TW-HAM2000, TW-HAM2500 and TW-HAM2500H are not only different in height, but also in plate thickness range. The following table lists the preliminary selection conditions based on the existing quotation data; the single extreme value is not a guarantee for any combination of processing, and the length, weight, straightness and positioning method of the panel must be matched.

TW-HAM assembly machine preliminary comparison
參數TW-HAM2000TW-HAM2500TW-HAM2500H
腹板高度200–2000 mm200–2500 mm200–2500 mm
腹板厚度6–40 mm6–40 mm6–60 mm
翼緣厚度6–60 mm6–40 mm6–80 mm
翼緣寬度200–800 mm200–800 mm200–800 mm

tack welding requires compliance with subsequent welding processes

The position, length, spacing, welding consumables and welding parameters of tack welding should be determined according to the subsequent WPS and workpiece conditions. The quality and starting and ending positions of the tack welding that needs to be melted by the main welding must be checked; defects that are not allowed to be retained should be dealt with according to regulations before main welding. The general process description on the web page cannot be regarded as the tack welding parameters of a certain joint.

After tack welding is completed, the joint should be checked for changes due to loosening or movement. The handling support, lifting position and turning plan must match the tack welding structure. Personnel cannot determine that any lifting conditions are met just based on the appearance of continuity.

According to the phenomenon, temporary remedies are not provided at the main welding station.

Assembly exception troubleshooting order
現象First checkProcessing and review
Gap changes along lengthSlat straightness, trimming and roller conveyor supportProcess the incoming materials or supports first, and then retest the joints
web bias is unstablePositioning reference, roller group settings and feeding statusReset to same basis and inspect first article
Dimensional changes after loosening the clampForced assembly, tack welding arrangement and supportVerification of tack welding workmanship and original deformation
tack welding hinders main weldingtack welding size, quality, position and subsequent weldingProcess according to the approved process and feedback to the assembly station
Section offset after transferLifting support, tack welding integrity and handling actionsIsolation review, verification after adjusting the transport plan

Before handing over to the main welder, there should be clear release records

  • The drawing number, material, plate batch and feeding direction are consistent, and ordinary and special beam types are marked respectively.
  • The web position, flange extension, cross-sectional geometry, staggered edges and gaps meet the agreed requirements.
  • tack welding The quality and the starting and ending sections that need to be processed have been checked, and the defects to be processed do not flow into the main welding.
  • The transfer and turning method of the longest and heaviest workpiece has been confirmed.
  • Inspection results, operation settings and exception handling follow the handover of the workpiece, and the first piece is re-verified after the changeover.