01 / Workpiece data
02 / Equipment matching
03 / Workshop and site interfaces
04 / Installation and acceptance
Example of communication results: What should be written in a plan
The following is an example of filling in the structure, which does not represent a delivered project; the formal document is formed according to the equipment model and contract scope.
| file | Content examples | Requires joint confirmation |
|---|---|---|
| Device configuration list | Process → Equipment model → Workpiece range → Standard → Optional | Materials and workmanship conditions for each capability; supply quantities and boundaries |
| Layout and interface table | Main machine, roller conveyor, buffer, channel, foundation and utility interface | Drawing dimensions, equipment installation standards, customer site preparation responsibilities |
| Danh sách kiểm tra chuẩn bị lắp đặt | Móng/đường ray, nguồn điện/nối đất, nguồn không khí, cẩu, vật liệu máy thử | Người chịu trách nhiệm, thời gian hoàn thành, biên bản kiểm tra |
| Hồ sơ nghiệm thu và đào tạo | Số bản vẽ mẫu, yêu cầu về kích thước/mối hàn/bề mặt, các hạng mục vận hành và bảo trì | Tiêu chí phán đoán, phương pháp kiểm tra, danh sách vấn đề và hồ sơ kết thúc |

