01 / Workpiece data
02 / Equipment matching
03 / Workshop and site interfaces
04 / Installation and acceptance
Example of communication results: What should be written in a plan
The following is an example of filling in the structure, which does not represent a delivered project; the formal document is formed according to the equipment model and contract scope.
| file | Content examples | Requires joint confirmation |
|---|---|---|
| Device configuration list | Process → Equipment model → Workpiece range → Standard → Optional | Materials and workmanship conditions for each capability; supply quantities and boundaries |
| Layout and interface table | Main machine, roller conveyor, buffer, channel, foundation and utility interface | Drawing dimensions, equipment installation standards, customer site preparation responsibilities |
| Installation preparation checklist | Foundation/track, power supply/grounding, air source, hoisting, test machine materials | Responsible person, completion time, inspection records |
| Acceptance and training records | Sample drawing number, dimensions/welds/surface requirements, operation and maintenance items | Judgment criteria, inspection methods, problem lists and closure records |

